Hotel Perun - Bansko

Hotel Perun - Bansko

Eagles Nest - Bansko

Eagles Nest - Bansko


23.10.2019
Enthusiasm in Sofia Following Release of EC Report on Bulgaria
Sofia, October 23 (BTA) - More enthusiastic comments were heard in Sofia Wednesday, a day after the European Commission released its latest report under the Cooperation and Verification Mechanism (CVM) on steps Bulgaria...

CVM Report: Bulgaria Meets Commitments Made upon EU Accession for Reforming Judiciary and Fighting Organized Crime and Corruption 22.10.2019
CVM Report: Bulgaria Meets Commitments Made upon EU Accession for Reforming Judiciary and Fighting Organized Crime and Corruption
Brussels, October 22 (BTA) - Releasing Tuesday the latest report on Bulgaria's efforts to reform the judiciary and fight organized crime and corruption, the European Commission said the country's progress is sufficient...

PM Borissov Meets with New US Ambassador Mustafa 22.10.2019
PM Borissov Meets with New US Ambassador Mustafa
October 22 (BTA) - Meeting with the new US Ambassador to Bulgaria, Herro Mustafa, on Tuesday, Prime Minister Boyko Borissov said Bulgaria and the US are allies and strategic partners. The two countries have established...


Weather/BNB fixing 24.10.19

20° Sofia 21° Plovdiv
20° Burgas 17° Stara Zagora
21° Varna 20° Rousse
CHF 1.59816 GBP 2.31651 USD 1.4962
MaxConsult.bg is a member of
www.fiabci.com www.nsni.bg www.bcci.bg/bulgarian/

Millenium Complex, Bansko

Investor: Millenium 2000
Executor:
Designer: Arch. Ivaylo Mishev, Arch. Daniel Edrev, Arch. Atanas Tankov
Supervision: MaxConsult.BG
Contact: +359 2 971 8800   Enquiry form

Skype Me! Millenium Complex, Bansko
 

Stage:
The following summary depicts the construction of a luxurious five-star hoe complex in Bansko, located in proximity to the lower gondola lift station and developed on a free territory within 11 000 sq. m.

The hotel complex consists of these differentiated zones:
• Hotel part
• Individual houses
• Sports-recreation center
• Balneology
• Internal recreation space
• Over- and underground parking places

The preliminary design is worked out as a skilful combination in Bansko spirit with its uniqueness and atmosphere, and the modern trends in creating the architectural image of hotel, offering comfort and facilities all year long.

Each of the zones has the following contents:

Hotel part

The hotel part is detached and planned in three separate sections, connected with each other by means of communication centers and personable foyer with glazing on the entire front façade. In the separate levels, the following premises can be found:
• Basement: underground garages, technological premises, kitchen servicing block, wine-cellar, night-bar, adjacent premises
• Ground floor: entrance foyer, reception, staff premises, outlets, lobby-bar, day-bar, ski wardrobe, business center, conference halls, sports-recreation section with swimming pool, main restaurant, balneology, separate economic entrance, entrance for guests, visiting only the sports-recreation center
• First floor – hotel rooms with two or three beds, small apartments, Internet club, quiet games.
• Second floor – hotel rooms, apartments, vertical communications
• Panorama floor – suites, panorama bar
During the process of designing the hotel part, all required for such hotel class installations are foreseen:
• Air-conditioning
• Convector heating
• Central dust-removing system
• Structure cabling
• Internet, TV, DVD
• Joinery work in combination with aluminum and wood
• Fir-signaling and fire-extinguishing
• Magnetic cards

Individual houses

The individual houses are located within the internal space of the complex. Each of them has 57.5 sq. m of built-up area and general construction of 178 sq. m. They include:
- Entrance hall, living-room, kitchen, WC, two bedrooms with two bathrooms, closet, internal stairs.

Each can take up from 4 to 6 guests who have at their disposal all facilities of the hotel complex.

Sports-recreation center

The center as it is designed offers high level of the following services:
• Swimming pool
• Fitness
• Saunas with different temperatures
• Massage premises
• Physician’s premises
• Aerobics
The pool is planned to be entirely open-air during summertime.

Internal recreation space

The internal space is thoroughly designed with respect to the necessity for a full relaxation of hotel guests and because of that the following parts are foreseen:
• Garden bar
• Open children swimming pool
• Children playground
• Tennis court
• Rock gardens
• Barbeque
• Stone river with wooden bridge

Over- and underground parking places

The complex has 45 over-ground parking places and 40 underground, designed according to the assignor’s reference wit independent entrance and control.

The preliminary architectural design is worked out entirely in compliance with investor’s requirements, as in the next phase all zones will be specified and altered, if necessary

Technical indices

1. Built-up area = 3 700 sq. m
2. Spread built-up area – 15 400 sq. m
3. Hotel part
• Double rooms – 67
• Apartments – 28
• Luxurious apartments – 7

Total bed reserve – 260 beds

Individual houses – 10

Total bed reserve – 40 beds