Belvedere Holiday Club - Bansko

Belvedere Holiday Club - Bansko

Kosherinata - Bansko

Kosherinata - Bansko


Lack of Quorum Quashes Extraordinary Sitting of Parliament Called on Motion of Opposition 13.8.2020
Lack of Quorum Quashes Extraordinary Sitting of Parliament Called on Motion of Opposition
August 13 (BTA) - Parliament on Thursday failed to ensure the requisite quorum of 121 MPs to hold an extraordinary sitting called on a motion of the opposition Bulgarian Socialist Party (BSP). Seventy-eight MPs had...

5,108 PCR Tests Confirm 171 New COVID-19 Cases, Bringing Bulgaria\'s Total to 13,893 13.8.2020
5,108 PCR Tests Confirm 171 New COVID-19 Cases, Bringing Bulgaria's Total to 13,893
August 13 (BTA) - The number of confirmed COVID-19 cases in Bulgaria reached 13,893 on Thursday after 171 new infections were confirmed over the last 24 hours, out of 5,108 PCR tests, according to data posted on...

5,388 PCR Tests Confirm 210 COVID-19 Cases, Bringing Bulgaria\'s Total to 13,722 12.8.2020
5,388 PCR Tests Confirm 210 COVID-19 Cases, Bringing Bulgaria's Total to 13,722
August 12 (BTA) - The number of confirmed COVID-19 cases in Bulgaria reached 13,722 after 210 infections were confirmed in the 24 hours until Tuesday midnight through 5,388 PCR tests, according to data posted on...


Weather/BNB fixing 14.08.20

20° Sofia 21° Plovdiv
20° Burgas 17° Stara Zagora
21° Varna 20° Rousse
CHF 1.59816 GBP 2.31651 USD 1.4962
MaxConsult.bg is a member of
www.fiabci.com www.nsni.bg www.bcci.bg/bulgarian/

Mount Blan Apartment House - Bansko

Investor: M-tours SPLtd.
Executor: M- Stroy SPLtd.
Designer: arch. Kalpachki
Supervision: Max Consult.bg
Contact: +359 2 971 8800   Enquiry form

Skype Me! Mount Blan Apartment House - Bansko
  

Stage: finished, 2005
MAX CONSULT.BG Ltd. has consulted the owners and the investor with the purpose of achieving high results for realization of the investment intentions of the parties, co-operating in order the respective documents and contracts for the investment process to be prepared and undersigned.

Consultancy house MAX CONSULT.BG Ltd. has rendered assistance to EM-STROY Ltd. in conducting the procedure for the design documentation DDP-CP /Detailed Development Plan – Construction Plan/ for both properties, approving the design and issuing a construction permit, following entering into operation.

The design has been worked out on the grounds of investor’s references, specified by MAX CONSULT.BG Ltd. which foresees the constructing of two blind wall buildings. The entrance is situated in the south-eastern part and services both buildings, as very closely the reception and the management offices are located.

The erection is connected with the purpose of achieving high results and a larger built-up area. Apartments of different type are designed, as a communication between the ground floor and high levels in the building is secured in order to be used a common elevator.

In the ground floor of the building, there are SPA-center, having a steam bath, Jacuzzi, showers, changing rooms, fitness and parking. The development is managed as a four-star hotel, as the relevant and needed facilities have been secured. The building façade is of dragged orange plaster, a suitable stone – gneiss is secured, there are wooden props and casings; the roof is finished with tiles.