PirinWoodPark

PirinWoodPark

Alpen - NoNaMe - Bansko

Alpen - NoNaMe - Bansko


Parliament Allows Nurses and Midwives to Run Their Own Practices 05.6.2020
Parliament Allows Nurses and Midwives to Run Their Own Practices
Sofia, June 4 (BTA) - The National Assembly allowed doctors' assistants, nurses, midwives and rehabilitation therapists to set up a new type of medical treatment establishments. Passing amendments to the Medical...

25 New COVID-18 Cases Bring Bulgaria\'s Total to 2,585 05.6.2020
25 New COVID-18 Cases Bring Bulgaria's Total to 2,585
June 4 (BTA) - The number of confirmed COVID-19 cases in Bulgaria reached 2,585 on Thursday after 25 new infections were confirmed over the last 24 hours, the chief of the national coronavirus task force, Prof....

National Assembly Passes Draft 2019 Report of Commission for Protection of Discrimination 04.6.2020
National Assembly Passes Draft 2019 Report of Commission for Protection of Discrimination
Sofia, June 3 (BTA) - On Wednesday the National Assembly passed the draft report on the activity of the Commission for Protection against Discrimination (CPD) for 2019. The report of the parliamentary Committee on...


Weather/BNB fixing 06.06.20

20° Sofia 21° Plovdiv
20° Burgas 17° Stara Zagora
21° Varna 20° Rousse
CHF 1.59816 GBP 2.31651 USD 1.4962
MaxConsult.bg is a member of
www.fiabci.com www.nsni.bg www.bcci.bg/bulgarian/

Villa Daizy - Bansko

Investor: Front Side SPLtd.
Executor: Balkanstroy - Razlog
Designer: Daizy MM SPLtd.
Supervision: Max Consult.bg
Contact: +359 2 971 8800   Enquiry form

Skype Me! Villa Daizy - Bansko
  

Stage: finished, 2006
MAX CONSULT.BG Ltd. has consulted the owners and the investor with the purpose of achieving high results for realization of the investment intentions of the parties, it has co-operated for preparing and undersigning the respective documents and contracts for the investment process.

Consultancy house MAX CONSULT.BG Ltd. has collaborated with the investor for conducting the design documentation for the property, including Detailed Development Plan /DDP/ under art. 150 from Spatial Planning Act for “Complex investment project for a hotel”, approving the designs, issuing a construction permit, providing a construction company, concluding the necessary contracts and realization of the relevant legal relations, building, finishing and entering into exploitation.

The entire idea for the realization of the construction and the investment project is formed completely under the leadership and control of MAX CONSULT.BG Ltd. The intention that up to the moment is for erecting a complex of three adjacent buildings with respect to better functionality of the developments, lower costs for constructing the infrastructure, easy property management and servicing the buildings by one personnel. Thus, the offered facilities can be used by all owners and tenants of the apartments.

Villa “DAISY” is of apartment type and it is the third building from the complex which includes all needed amenities.

A central entrance from the west side of the building is secured, as well for the ramp, leading to the basement. Lobby-bar with reception and studios are planned in the ground floor. Special installations are finished; video surveillance, cable and satellite TV, telephones and wireless Internet are secured. There is a SPA-center with sauna, Jacuzzi, showers and sanitary premises, ski storage; underground parking and storage premises are designed for the basement of the building.

The building utilizes the electrical substation which is designed, constructed and entered into exploitation for the complex.

The development is a participant in the contest “Building of the year 2006” and it distinguishes itself with original perception and unique interpretation, combined in it the tradition of Bansko with stone, wood and plaster. The high quality of the construction materials contributes for the different and individual character of the building.

MAX CONSULT.BG Ltd. provides the external connections.

Consultancy house MAX CONSULT.BG Ltd. secures the forming of all contracts, documentation and notary transfer of the ownership for the separate properties, as well as for the entire supervision of the object and the complex from three adjacent buildings.

The development has been entered into exploitation by MAX CONSULT.BG Ltd., 2005.