Hotel Perun - Bansko

Hotel Perun - Bansko

Alpen - NoNaMe - Bansko

Alpen - NoNaMe - Bansko


Prime Minister Talks with Experts from US Department of State and Department of Energy 10.12.2019
Prime Minister Talks with Experts from US Department of State and Department of Energy
Prime Minister Boyko Borissov met with experts from the US Department of State and Department of Energy in Sofia on Tuesday, the Bulgarian government information service said. The US delegation's visit comes in...

Education Minister Slams Universities for Failing in Teacher Training 10.12.2019
Education Minister Slams Universities for Failing in Teacher Training
December 10 (BTA) - Speaking at a conference on the prospects and challenges before teacher training in Bulgaria on Tuesday, Education and Science Minister Krasimir Vulchev slammed universities for failing in this...

October Average Contributory Income at Lv 1,002.75 10.12.2019
October Average Contributory Income at Lv 1,002.75
Sofia, December 10 (BTA) - Bulgaria's average contributory income in October stood at 1,002.75 leva, said the National Social Security Institute. The average monthly contributory income for the period between November...


Weather/BNB fixing 11.12.19

20° Sofia 21° Plovdiv
20° Burgas 17° Stara Zagora
21° Varna 20° Rousse
CHF 1.59816 GBP 2.31651 USD 1.4962
MaxConsult.bg is a member of
www.fiabci.com www.nsni.bg www.bcci.bg/bulgarian/

Villa Vitality Apartment House - Bansko

Investor: Vitality 1 Ltd.
Executor: Balkanstroy - Razlog
Designer: Arhistro-2000 SPLtd.
Supervision: Max Consult.bg
Contact: +359 2 971 8800   Enquiry form

Skype Me! Villa Vitality Apartment House - Bansko
  

Stage: finished, 2005
MAX CONSULT.BG Ltd. has consulted the owners and the investor with the purpose of achieving high results for realization of the investment intentions of the parties, has co-operated for preparing and undersigning the respective documents and contracts for the investment process.

Consultancy house MAX CONSULT.BG Ltd. has collaborated with the investor for proceeding the design documentation, approving the designs, issuing a construction permit, providing a construction company, concluding the necessary contracts and realization of the relevant legal relations, building, finishing and entering into exploitation.

The entire idea for the realization of the construction and the investment project is formed completely under the leadership and control of MAX CONSULT.BG Ltd. The intention that up to the moment is for erecting a complex of three adjacent buildings with respect to better functionality of the developments, lower costs for constructing the infrastructure, easy property management and servicing the buildings by one personnel. Thus, the offered facilities can be used by all owners and tenants.

Villa “VITALITY” has 16 apartments and it is the first building of the complex which includes all needed amenities and meets the requirements for a hotel. It has a unique and original perception, typical version of the traditional Bansko architecture in a modern aspect – light ochre is the plaster, golden gneiss is the selected stone, the props and the wooden bordering are in dark brown. The whole vision gives a kind of modernized interpretation of the Bansko tradition in building a home. There is greenery in the yard; the fence is open-work. The erection is angle-formed on a corner plot. There is secured a central entrance from the west side, as there are lobby-bar with reception, sanitary premises, ski storage, offices for the management with sanitary and sleeping premises, outlet, one studio and apartment on the ground floor. Special installations are finished; video surveillance, cable and satellite TV, telephones and wireless Internet are secured. In the basement of the building, there are also foreseen and finished underground parking with 12 garages, common laundry premises, storages, SPA-center with sauna, Jacuzzi, showers and sanitary units.

According to consultant’s references, the office of MAX CONSULT.BG Ltd. is designed, located in the last forth floor of the building in its south-eastern part with wonderful view to Todorka Peak and Vihren Peak of Pirin Mountain.

There is a designed, constructed and entered into exploitation electrical substation of the complex and also external connections, secured by MAX CONSULT.BG Ltd.

Consultancy house MAX CONSULT.BG Ltd. secures the forming of all contracts, documentation and notary transfer of the ownership for the separate properties, as well as for the entire supervision of the object and the complex from three adjacent buildings.

The development has been entered into exploitation by MAX CONSULT.BG Ltd., 2005.