Balmoral - Bansko

Balmoral - Bansko

Panorama, Razlog

Panorama, Razlog


Bulgarian Regional Development Ministry, Macedonian Local Self-Government Ministry Sign Memorandum of Understanding 20.8.2019
Bulgarian Regional Development Ministry, Macedonian Local Self-Government Ministry Sign Memorandum of Understanding
August 20 (BTA) - Bulgarian Minister of Regional Development and Public Works Petya Avramova and Macedonian Minister of Local Self-Government Goran Milevski signed here a memorandum of understanding between the...

Meeting Jordan 20.8.2019
Meeting Jordan
August 20 (BTA) - Prime Minister Boyko Borissov met with visiting Jordanian Foreign Minister Ayman Safadi, the Bulgarian government press office reported on Tuesday. During the talks, Borissov said Jordan is an...

19.8.2019
Farmers to Receive Lv 84 Mln as Reduced Excise Duty on Gas Oil
August 19 (BTA) - Farmers will be paid up to 84 million leva under the State aid scheme "Reduced Excise Duty on Gas Oil Used in Primary Agricultural Production", the Agriculture, Food and Forestry Ministry said Monday....


Weather/BNB fixing 21.08.19

20° Sofia 21° Plovdiv
20° Burgas 17° Stara Zagora
21° Varna 20° Rousse
CHF 1.59816 GBP 2.31651 USD 1.4962
MaxConsult.bg is a member of
www.fiabci.com www.nsni.bg www.bcci.bg/bulgarian/

Villa Front Side - Bansko

Investor: Front Side SPLtd.
Executor: Balkanstroy - Razlog
Designer: Arhistro-2000 SPLtd.
Supervision: Max Consult.bg
Contact: +359 2 971 8800   Enquiry form

Skype Me! Villa Front Side - Bansko
 

Stage: finished, 2005
MAX CONSULT.BG Ltd. has consulted the owners and the investor with the purpose of achieving high results for realization of the investment intentions of the parties, has co-operated for preparing and undersigning the respective documents and contracts for the investment process.

Consultancy house MAX CONSULT.BG Ltd. has collaborated with the investor for proceeding the design documentation, approving the designs, issuing a construction permit, providing a construction company, concluding the necessary contracts and realization of the relevant legal relations, building, finishing and entering into exploitation.

The entire idea for the realization of the construction and the investment project is formed completely under the leadership and control of MAX CONSULT.BG Ltd. The intention that up to the moment is for erecting a complex of three adjacent buildings with respect to better functionality of the developments, lower costs for constructing the infrastructure, easy property management and servicing the buildings by one personnel. Thus, the offered facilities can be used by all owners and tenants of the apartments.

Villa “FrontSide” is of apartment type and it is the second building from the complex which includes all needed amenities and meets the requirements for a hotel. There are used traditional materials for the construction of the building, together with much glass with complete modernization of the vision and achieving individuality of the development. The erection is on a corner estate. There is secured a central entrance from the north side, as there are lobby-bar with reception, sanitary premises, ski storage, offices for the management with sanitary and sleeping premises, outlet, one studio and apartment on the ground floor. Special installations are finished; video surveillance, cable and satellite TV, telephones and wireless Internet are secured. Underground parking and storages are foreseen and finished in the ground floor.

The building utilizes the electrical substation which is designed, constructed and entered into exploitation for the complex.

MAX CONSULT.BG Ltd. provides the external connections.

Consultancy house MAX CONSULT.BG Ltd. secures the forming of all contracts, documentation and notary transfer of the ownership for the separate properties, as well as for the entire supervision of the object and the complex from three adjacent buildings.

The development has been entered into exploitation by MAX CONSULT.BG Ltd., 2005.