Lavina SPA & Ski Lodge - Bansko
Max Consult.Bg Ltd. has consulted the project as it has secured the deal for purchasing from the owner and the choice for the senior designer for implementation of the new owner’s investment intention, the conducting of all procedures and designing, and organizing the commenced construction.
Kosherinata - Bansko
Max Consult.BG Ltd. has consulted and designed the project “Kosherinata Alpen 2”, as it has secured the deal for settling the legal relations with owners and the choice for chief designer for the implementing the investment intention of the investor STIL TAK Ltd., conducting all
01.3.2024
Bansko Skiing Zone Concessionaire Presents to Environment Minister Conceptual Design for New Ski Gondola
Sofia, January 4 (BTA) - Meeting with Environment Minister Neno Dimov and the Mayor of Bansko on Thursday, officials of Ulen, the company running the Bansko skiing zone, presented a conceptual design for a second...
02.6.2023
The first 20 years Max Consult.BG Ltd., Congratulations!
07.3.2023
UPDATED Bulgaria's First Floating Solar Power Plant Project Unveiled in Sofia
SOFIA,
07.03.2023 08:31 | UPDATED 07.03.2023 11:32
(BTA)
A major project for building Bulgaria’s first floating solar power plant was presented in Sofia on Tuesday.
Construction of the plant in the water area...
Weather/BNB fixing 15.01.25
20° | Sofia | 21° | Plovdiv | ||||||||
20° | Burgas | 17° | Stara Zagora | ||||||||
21° | Varna | 20° | Rousse | ||||||||
|
Balmoral - Bansko
Investor: B L P Consulting SPLtd.
Executor: project
Designer: Arhistro-2000 Ltd.
Supervision: Max Consult.bg
Contact: +359 2 971 8800 Enquiry form
Stage: project
Balmoral Spa & Residence is ideally located. Its proximity to both the main lift and the beautiful old town of Bansko with its many
Facilities:
- Ski Storage
- Fitness Club
- Spa centre
- Swimming Pool
- Sauna
- Steam Room
- Jacuzzi
- Restaurant
- Lobby Bar
- Kids Club
- Internet Club
- Pool Tables
- Table Tennis Facilities
- Barbeque Area
- Underground Parking
- Landscaped Garden
- Shopping Area
- Laundrette
- Medical centre
- 24 hour Security
The building distances to the street regulation lines of the landed estate are 3 m to the estate bottom and more than 1/3 H to the side regulation. The building height is 13 m.
Description: The building has a composition of monolith reinforced concrete. The façade walls are of 25 cm bricks, heat insulated with styrodur and the partitioned - of 12 cm. The roof is of two 45 and 18 degree slopes and is finished with wooden construction, wooden bordering and tiles on concrete carrying, covering construction. The heat insulation is situated on the reinforced concrete slab over the last floor and parts of the sloping roof. The architectural project has been consorted with all acting in the Republic legal articles and regulations, as well as the investors’ requirements.
Architectural decision: The building is four storey with ground floor and under-roof floors. There are entrance lobby, reception, two staircases with elevators, lobby-bar, space /garden/ for children, billiards, tennis table, four offices and apartments which are located on the ground floor.
The ground floor is enriched with internal garden of planted greenery where barbecue, solariums and water areas are located.
Apartments are located on the second, third, forth and under-roof floors.
Spa-center with swimming pool, Jacuzzi, fitness, sauna, steam bath and medical sector, restaurant with kitchen, ski wardrobe, laundry premise, underground parking lots, storage and installation rooms.
Facade design: Architectural outlook with traditional materials has been searched - stone, wood, mineral plaster – close to the old architecture of Bansko, the nature and the mountain. The building silhouette is enriched with two components /turrets/ in its angles.
The ground floor and the angle components of the building are finished with suitable stone revetment, intercepted by horizontal props. The floors are covered up with mineral plaster. The balcony railings are wooden and plastered, and are finishing with wooden hand-grip, balconies are separated with light wooden partition, and the opposite to balcony door is edged with wood. The joinery is plastic, having the colour of the wooden components. The building eaves are edged from beneath with wooden wainscoting. All covering slopes are finished with bitumen tiles, and the slopes with slight inclination – with rolled bitumen hydraulic seal.